ARTICLE X MISCELLANEOUS
|
<response> ARTICLE X MISCELLANEOUS </response>
|
201
|
Section 10 . 1 Notices .
|
<response> Section 10 . 1 Notices . </response>
|
202
|
All notices or other communications under this Loan Agreement will be sufficiently given and will be deemed given when delivered or mailed as provided in the Indenture .
|
<response> All notices or other communications under this Loan Agreement will be sufficiently given and will be deemed given when delivered or mailed as provided in the Indenture . </response>
|
203
|
Section 10 . 2 Binding Effect .
|
<response> Section 10 . 2 Binding Effect . </response>
|
204
|
This Loan Agreement will inure to the benefit of and will be binding upon the Issuer , the Company and their respective successors and assigns , subject , however , to the limitations contained in Section 6 . 1 .
|
<response> This Loan Agreement will inure to the benefit of and will be binding upon the Issuer , the Company and their respective successors and assigns , subject , however , to the limitations contained in Section 6 . 1 . </response>
|
205
|
Section 10 . 3 Severability .
|
<response> Section 10 . 3 Severability . </response>
|
206
|
If any provision of this Loan Agreement is determined to be unenforceable at any time , that will not affect any other provision of this Loan Agreement or the enforceability of that provision at any other time .
|
<response> If any provision of this Loan Agreement is determined to be unenforceable at any time , that will not affect any other provision of this Loan Agreement or the enforceability of that provision at any other time . </response>
|
207
|
Section 10 . 4 Amendments .
|
<response> Section 10 . 4 Amendments . </response>
|
208
|
After the issuance of the Bonds , this Loan Agreement may not be effectively amended or terminated without the written consent of the Trustee and , if a Letter of Credit is in effect , the Bank and in accordance with the provisions of the Indenture .
|
<response> After the issuance of the Bonds , this Loan Agreement may not be effectively amended or terminated without the written consent of the Trustee and , if a Letter of Credit is in effect , the <organization>Bank</organization> and in accordance with the provisions of the Indenture . </response>
|
209
|
Section 10 . 5 Right of Company To Perform Issuer ' s Agreements .
|
<response> Section 10 . 5 Right of Company To Perform Issuer ' s Agreements . </response>
|
210
|
The Issuer irrevocably authorizes and empowers the Company to perform in the name and on behalf of the Issuer any agreement made by the Issuer in this Loan Agreement or in the Indenture which the Issuer fails to perform in a timely fashion if the continuance of such failure could result in an Event of Default .
|
<response> The Issuer irrevocably authorizes and empowers the Company to perform in the name and on behalf of the Issuer any agreement made by the Issuer in this Loan Agreement or in the Indenture which the Issuer fails to perform in a timely fashion if the continuance of such failure could result in an Event of Default . </response>
|
211
|
This Section will not require the Company to perform any agreement of the Issuer .
|
<response> This Section will not require the Company to perform any agreement of the Issuer . </response>
|
212
|
Section 10 . 6 Applicable Law .
|
<response> Section 10 . 6 Applicable Law . </response>
|
213
|
This Loan Agreement will be governed by and construed in accordance with the laws of the Commonwealth .
|
<response> This Loan Agreement will be governed by and construed in accordance with the laws of the <location>Commonwealth</location> . </response>
|
214
|
Section 10 . 7 Captions ; References to Sections .
|
<response> Section 10 . 7 Captions ; References to Sections . </response>
|
215
|
The captions in this Loan Agreement are for convenience only and do not define or limit the scope or intent of any provisions or Sections of this Loan Agreement .
|
<response> The captions in this Loan Agreement are for convenience only and do not define or limit the scope or intent of any provisions or Sections of this Loan Agreement . </response>
|
216
|
References to Articles and Sections are to the Articles and Sections of this Loan Agreement , unless the context otherwise requires .
|
<response> References to Articles and Sections are to the Articles and Sections of this Loan Agreement , unless the context otherwise requires . </response>
|
217
|
Section 10 . 8 Complete Agreement .
|
<response> Section 10 . 8 Complete Agreement . </response>
|
218
|
This Loan Agreement represents the entire agreement between the Issuer and the Company with respect to its subject matter .
|
<response> This Loan Agreement represents the entire agreement between the Issuer and the Company with respect to its subject matter . </response>
|
219
|
Section 10 . 9 Termination .
|
<response> Section 10 . 9 Termination . </response>
|
220
|
When no Bonds are Outstanding under the Indenture , the Company and the Issuer will have no further obligations under this Loan Agreement , except for the Company ' s obligations under Sections 5 . 2 , 6 . 3 , 6 . 4 , 7 . 2 and 9 . 3 .
|
<response> When no Bonds are Outstanding under the Indenture , the Company and the Issuer will have no further obligations under this Loan Agreement , except for the Company ' s obligations under Sections 5 . 2 , 6 . 3 , 6 . 4 , 7 . 2 and 9 . 3 . </response>
|
221
|
Section 10 . 10 Counterparts .
|
<response> Section 10 . 10 Counterparts . </response>
|
222
|
This Loan Agreement may be signed in several counterparts .
|
<response> This Loan Agreement may be signed in several counterparts . </response>
|
223
|
Each will be an original , but all of them together constitute the same instrument .
|
<response> Each will be an original , but all of them together constitute the same instrument . </response>
|
224
|
10
|
<response> 10 </response>
|
225
|
< PAGE >
|
<response> < PAGE > </response>
|
226
|
Section 10 . 11 Limitation of Liability .
|
<response> Section 10 . 11 Limitation of Liability . </response>
|
227
|
Notwithstanding anything to the contrary provided in this Loan Agreement or the Indenture , each and every term , covenant , condition and provision of this Loan Agreement is made specifically subject to the provisions of this Section 10 . 11 .
|
<response> Notwithstanding anything to the contrary provided in this Loan Agreement or the Indenture , each and every term , covenant , condition and provision of this Loan Agreement is made specifically subject to the provisions of this Section 10 . 11 . </response>
|
228
|
It is specifically understood and agreed that the liability of the Company is limited to the Company ' s interest in the obligations of Pittston Coal Terminal Corporation to make payments with respect to the Bonds under Section 3 . 2 ( a )( ix ) of the Throughput Agreement and is payable solely from those payments and collateral , if any , specifically pledged for such purpose .
|
<response> It is specifically understood and agreed that the liability of the Company is limited to the Company ' s interest in the obligations of <organization>Pittston Coal Terminal Corporation</organization> to make payments with respect to the Bonds under Section 3 . 2 ( a )( ix ) of the Throughput Agreement and is payable solely from those payments and collateral , if any , specifically pledged for such purpose . </response>
|
229
|
Any liability or obligation of the Company arising out of or from this Loan Agreement will be a liability or obligation of and enforceable against the Company only and will not be a liability or obligation of or enforceable against any Partner of the Company individually or in its capacity as a partner .
|
<response> Any liability or obligation of the Company arising out of or from this Loan Agreement will be a liability or obligation of and enforceable against the Company only and will not be a liability or obligation of or enforceable against any Partner of the Company individually or in its capacity as a partner . </response>
|
230
|
Section 10 . 12 Limited Nature of Company ' s Obligations ; Pittston Terminal ' s Liability for Obligations of the Company ; Certain Decisions Regarding the Bonds .
|
<response> Section 10 . 12 Limited Nature of Company ' s Obligations ; <organization>Pittston Terminal</organization> ' s Liability for Obligations of the Company ; Certain Decisions Regarding the Bonds . </response>
|
231
|
As provided in the Throughput Agreement and the Agreement Regarding 2003 Brink ' s Bonds , dated as of August 15 , 2003 , among the Company , the Partners and Pittston Terminal , all of the Company ' s obligations with respect to the Bonds are payable solely from payments received by the Company from Pittston Terminal pursuant to the Throughput Agreement and Pittston Terminal shall act as the agent of the Company for purposes of making certain Company decisions relating to the Bonds .
|
<response> As provided in the Throughput Agreement and the Agreement Regarding 2003 Brink ' s Bonds , dated as of August 15 , 2003 , among the Company , the Partners and <organization>Pittston Terminal</organization> , all of the Company ' s obligations with respect to the Bonds are payable solely from payments received by the Company from <organization>Pittston Terminal</organization> pursuant to the Throughput Agreement and <organization>Pittston Terminal</organization> shall act as the agent of the Company for purposes of making certain Company decisions relating to the Bonds . </response>
|
232
|
11
|
<response> 11 </response>
|
233
|
< PAGE >
|
<response> < PAGE > </response>
|
234
|
PENINSULA PORTS AUTHORITY OF VIRGINIA
|
<response> <organization>PENINSULA PORTS AUTHORITY</organization> OF <location>VIRGINIA</location> </response>
|
235
|
By : / s / Robert E . Yancey ----------------------------------------- Chairman
|
<response> By : / s / <person>Robert E</person> . <person>Yancey</person> ----------------------------------------- Chairman </response>
|
236
|
DOMINION TERMINAL ASSOCIATES , a General Partnership
|
<response> <organization>DOMINION TERMINAL ASSOCIATES</organization> , a General Partnership </response>
|
237
|
By : / s / Charles E . Brinley ----------------------------------------- President
|
<response> By : / s / <person>Charles E</person> . <person>Brinley</person> ----------------------------------------- President </response>
|
238
|
12
|
<response> 12 </response>
|
239
|
< PAGE >
|
<response> < PAGE > </response>
|
240
|
EXHIBIT A
|
<response> EXHIBIT A </response>
|
241
|
DESCRIPTION OF FACILITIES -------------------------
|
<response> DESCRIPTION OF FACILITIES ------------------------- </response>
|
242
|
The Dominion Terminal Associates coal facility is sized to have an annual throughput of approximately 20 million tons per year .
|
<response> <organization>The Dominion Terminal Associates</organization> coal facility is sized to have an annual throughput of approximately 20 million tons per year . </response>
|
243
|
A total ground storage capacity of approximately 1 . 5 million tons is available .
|
<response> A total ground storage capacity of approximately 1 . 5 million tons is available . </response>
|
244
|
The terminal pier and loading facilities are designed to handle colliers ranging in size from 20 , 000 to 173 , 000 dwt .
|
<response> The terminal pier and loading facilities are designed to handle colliers ranging in size from 20 , 000 to 173 , 000 dwt . </response>
|
245
|
and barges of varying sizes .
|
<response> and barges of varying sizes . </response>
|
246
|
The land on which the facility is located is on the east bank of the James River in Newport News , Virginia .
|
<response> The land on which the facility is located is on the <location>east bank of the James River in Newport News</location> , <location>Virginia</location> . </response>
|
247
|
It is bordered on the northwest by the Pier IX coal terminal and on the southeast by the CSX Piers 14 and 15 properties which are now limited in use , the primary business of Piers 14 and 15 appearing to be the leasing of the piers .
|
<response> It is bordered on the <location>northwest</location> by the <location>Pier IX coal terminal</location> and on the <location>southeast</location> by the <location>CSX Piers 14 and 15</location> properties which are now limited in use , the primary business of <location>Piers 14 and 15</location> appearing to be the leasing of the piers . </response>
|
248
|
The deep water channel , approximately 50 feet deep , borders the site .
|
<response> The deep water channel , approximately 50 feet deep , borders the site . </response>
|
249
|
Road access to the facility is from Harbor Road , which borders the south side of the terminal site .
|
<response> Road access to the facility is from <location>Harbor Road</location> , which borders the <location>south</location> side of the terminal site . </response>
|
250
|
1 .
|
<response> 1 . </response>
|
251
|
Railroad Service .
|
<response> Railroad Service . </response>
|
252
|
The coal terminal facility is served by CSX Transportation , Inc . CSX brings loaded cars to the empty tracks .
|
<response> The coal terminal facility is served by <organization>CSX Transportation</organization> , Inc . <organization>CSX</organization> brings loaded cars to the empty tracks . </response>
|
253
|
DTA moves the loaded cars from the empty tracks into position for dumping and then moves the cars back to the empty tracks .
|
<response> DTA moves the loaded cars from the empty tracks into position for dumping and then moves the cars back to the empty tracks . </response>
|
254
|
2 .
|
<response> 2 . </response>
|
255
|
Material Handling System .
|
<response> Material Handling System . </response>
|
256
|
The material handling system is designed so that coal may be unloaded from the railroad hopper cars and transported by conveyor directly to the shiploader for depositing in the holds of vessels .
|
<response> The material handling system is designed so that coal may be unloaded from the railroad hopper cars and transported by conveyor directly to the shiploader for depositing in the holds of vessels . </response>
|
257
|
However , most of the coal received is transported to one or two stacker / reclaimers for deposit on the ground storage piles .
|
<response> However , most of the coal received is transported to one or two stacker / reclaimers for deposit on the ground storage piles . </response>
|
258
|
An enclosed tandem rotary car dumper is used to unload the hopper cars two at a time .
|
<response> An enclosed tandem rotary car dumper is used to unload the hopper cars two at a time . </response>
|
259
|
The coal deposited in the hoppers beneath the dumper passes through a grizzly which prevents large foreign material from entering and damaging the belt conveying system .
|
<response> The coal deposited in the hoppers beneath the dumper passes through a grizzly which prevents large foreign material from entering and damaging the belt conveying system . </response>
|
260
|
Just prior to dumping , the rail cars pass through a thaw shed which assists in unloading during freezing weather .
|
<response> Just prior to dumping , the rail cars pass through a thaw shed which assists in unloading during freezing weather . </response>
|
261
|
Vibrating feeders transfer the coal from the receiving hoppers to the conveyor belts and place it on conveyor belts for elevation up above grade to a 1 , 000 - ton surge silo .
|
<response> Vibrating feeders transfer the coal from the receiving hoppers to the conveyor belts and place it on conveyor belts for elevation up above grade to a 1 , 000 - ton surge silo . </response>
|
262
|
The surge silo is used to increase unloading efficiency by allowing the coal to accumulate while the stacker / reclaimer is moving from one stockpile to another .
|
<response> The surge silo is used to increase unloading efficiency by allowing the coal to accumulate while the stacker / reclaimer is moving from one stockpile to another . </response>
|
263
|
A three - stage " as received " sampling system is provided at the 1 , 000 - ton storage silo .
|
<response> A three - stage " as received " sampling system is provided at the 1 , 000 - ton storage silo . </response>
|
264
|
While the unloading system is in operation , coal received may be diverted directly to waiting colliers or barges or transferred to either of two stacker / reclaimers for stacking in stockpiles .
|
<response> While the unloading system is in operation , coal received may be diverted directly to waiting colliers or barges or transferred to either of two stacker / reclaimers for stacking in stockpiles . </response>
|
265
|
The design rate for the receiving material handling system is 5 , 200 tons / hr .
|
<response> The design rate for the receiving material handling system is 5 , 200 tons / hr . </response>
|
266
|
A - 1
|
<response> A - 1 </response>
|
267
|
< PAGE >
|
<response> < PAGE > </response>
|
268
|
The reclaim system provides for reclaiming coal with either or both stacker / reclaimers and a reclaimer , then conveying it to two - 4 , 000 ton surge silos located near the pier .
|
<response> The reclaim system provides for reclaiming coal with either or both stacker / reclaimers and a reclaimer , then conveying it to two - 4 , 000 ton surge silos located near the pier . </response>
|
269
|
Reclaim from these surge silos goes directly to the pier - mounted shiploader for loading into the holds of coal carriers .
|
<response> Reclaim from these surge silos goes directly to the pier - mounted shiploader for loading into the holds of coal carriers . </response>
|
270
|
When blending two different types of coal is required , the proper percentage of each is withdrawn from each silo .
|
<response> When blending two different types of coal is required , the proper percentage of each is withdrawn from each silo . </response>
|
271
|
An " As Shipped " sampling system is located at the tail end of the conveyor leading to the shiploader .
|
<response> An " As Shipped " sampling system is located at the tail end of the conveyor leading to the shiploader . </response>
|
272
|
Belt scales are provided for both the unloading system and the shiploading system to provide the necessary information for managing the coal stockpiles , blending and as a check against the draft surveyor ' s measurement for the coal being loaded in vessels .
|
<response> Belt scales are provided for both the unloading system and the shiploading system to provide the necessary information for managing the coal stockpiles , blending and as a check against the draft surveyor ' s measurement for the coal being loaded in vessels . </response>
|
273
|
The design rate for the reclaim handling system is 6 , 800 tons / hr .
|
<response> The design rate for the reclaim handling system is 6 , 800 tons / hr . </response>
|
274
|
The shiploader and dock conveyor is rated at 6 , 500 tons / hr .
|
<response> The shiploader and dock conveyor is rated at 6 , 500 tons / hr . </response>
|
275
|
The higher capacity takes into account shiploader shutdowns for hatch changes .
|
<response> The higher capacity takes into account shiploader shutdowns for hatch changes . </response>
|
276
|
3 .
|
<response> 3 . </response>
|
277
|
Marine Facilities .
|
<response> Marine Facilities . </response>
|
278
|
The marine facilities include a dredge deep - water basin and shiploader pier .
|
<response> The marine facilities include a dredge deep - water basin and shiploader pier . </response>
|
279
|
The dredging provides access and berthing areas at the pier which extends towards shore from the Corps of Engineers ' pierhead line .
|
<response> The dredging provides access and berthing areas at the pier which extends towards shore from the <organization>Corps of Engineers</organization> ' pierhead line . </response>
|
280
|
An area on the south side of the pier has been dredged to a depth of 50 feet to match the existing channel .
|
<response> An area on the south side of the pier has been dredged to a depth of 50 feet to match the existing channel . </response>
|
281
|
The north side of the pier can be dredged to a depth of 50 feet if so necessitated by an increase in business .
|
<response> The north side of the pier can be dredged to a depth of 50 feet if so necessitated by an increase in business . </response>
|
282
|
The shiploader dock is designed as a finger pier with a berth on each side for loading colliers up to 173 , 000 dwt .
|
<response> The shiploader dock is designed as a finger pier with a berth on each side for loading colliers up to 173 , 000 dwt . </response>
|
283
|
It is provided with a trestle connection to shore .
|
<response> It is provided with a trestle connection to shore . </response>
|
284
|
The pier supports the shiploading conveyor and shiploader , plus a roadway with a turnaround area at the offshore end .
|
<response> The pier supports the shiploading conveyor and shiploader , plus a roadway with a turnaround area at the offshore end . </response>
|
285
|
Both faces of the pier are provided with a fendering system .
|
<response> Both faces of the pier are provided with a fendering system . </response>
|
286
|
A turning dolphin has been constructed at the outer end , connected by a walkway to the pier .
|
<response> A turning dolphin has been constructed at the outer end , connected by a walkway to the pier . </response>
|
287
|
4 .
|
<response> 4 . </response>
|
288
|
Mobile Equipment .
|
<response> Mobile Equipment . </response>
|
289
|
Mobile equipment is used for maintenance and operation of the coal terminal facility .
|
<response> Mobile equipment is used for maintenance and operation of the coal terminal facility . </response>
|
290
|
Switch engines are used to move trains while dozers are needed to assist the bucket wheel stackers and reclaimers in storing and reclaiming coal outside their reach .
|
<response> Switch engines are used to move trains while dozers are needed to assist the bucket wheel stackers and reclaimers in storing and reclaiming coal outside their reach . </response>
|
291
|
The following types of mobile equipment are provided for the facility :
|
<response> The following types of mobile equipment are provided for the facility : </response>
|
292
|
a . Track - mounted dozers with coal blades ;
|
<response> a . Track - mounted dozers with coal blades ; </response>
|
293
|
b .
|
<response> b . </response>
|
294
|
Switch Engines ;
|
<response> Switch Engines ; </response>
|
295
|
c . Mobile cranes ;
|
<response> c . Mobile cranes ; </response>
|
296
|
d . Flat - bed trucks ;
|
<response> d . Flat - bed trucks ; </response>
|
297
|
e . Pickup trucks ;
|
<response> e . Pickup trucks ; </response>
|
298
|
f . Automobiles ;
|
<response> f . Automobiles ; </response>
|
299
|
g . Maintenance vehicles ; and
|
<response> g . Maintenance vehicles ; and </response>
|